PROJECT HISTORY AND EXPERIENCE

Bateman Prior Involvement with Boleo :

The current Feasibility Study, about to be undertake by Bateman, is a logical extension of the due dilligence work conducted by Bateman on the Boleo Process Design in late 2001.  This exercise culminated in the delivery of a Pre-Feasibility Study document to Mintec International Corporation in 2002.

This study was carried out in two phases.  The first phase comprised a review in which the existing testwork database was evaluated in detail to determine whether a number of proposed circuit modifications to the original flowsheet were viable and offered promise of lower capital and operating costs.  Seven options were reviewed and ultimately a single "base case" option was selected for a more detailed analysis.  The second phase, detailed the process and engineering design and documents the derivation of capital and operating costs for the selected "base case" option.

The test work review phase was completed in Vancouver by a team of Bateman process specialists working in concert with the process consultant, Dr David Dreisinger, with input from members of the original study team.  The process and engineering design phase of the study was completed out of Bateman engineering offices in Brisbane and Perth in Australia.

Extensive batch and pilot plant test work had previously been undertaken on the full range of Boleo ore types, albeit for the purpose of developing a different flow sheet.  Fortunately a large proportion of the test work was relevant to both the original and current process flow sheet.  The basic leaching process is sound but a superior, more cost effective means of metal recovery is now being pursued.  The Bateman flowsheet proposes the use of a high rate CCD solid-liquid separation circuit followed by base metal recovery from the CCD wash solution.  The new flowsheet involves acid leaching of the copper, zinc, and cobalt, followed by rejection of the leach residue and separate recovery of copper and zinc metal and cobalt either as a metal product or a high value cobalt precipitate.  Fewer unit operations have resulted in lower capital and operating costs and the use of conventional unit processes will lower technical risk.

Designing and constructing plants for ores with high clay content is well within Bateman's current experience base. As recent experience in the nickel laterite plants in Western Australia has shown, large CCD circuits can operate effectively on difficult clayey ores to recover dissolved metal values.  Further test work is required in this area to confirm performance projections and this work is soon to be undertaken at a laboratory facility in the USA.


RELEVANT COPPER AND BASE METALS PROJECTS

Project

Client

Year

Service Provided

Concentrate Leach Project

Erdenet Mining Corporation

2004

Scoping Study for the Erdenet Mine for a 170,000t/a copper cathode project using two stage autoclave leaching followed by SXEW to treat existing flotation concentrate.

Birla Mt Gordon Conversion Project

Birla

2004

Engineering & Procurement (EPM) services for the conversion of the hydrometallurgical plant facility at Mt Gordon to a concentrator, producing a concentrate for export to India. 

Sepon Copper Project

Oxiana Resources

2003

EPCM for the Sepon Copper Project for a 60,000t/a copper cathode project using atmospheric and autoclave leaching followed by SXEW.

Sepon Copper Feasibility Study

Oxiana Resources

2002

Feasibility Study for the Sepon Copper Project for a 60,000t/a copper cathode project using atmospheric and autoclave leaching followed by SXEW.

Sepon Copper Scoping Study

Oxiana Resources

2001

Scoping study for a copper leach SX/EW plant in Laos.

Gibraltar Copper Project

Gibraltar Mines Ltd-CESL

2001

Feasibility Study for a 25,000tpa copper leach SX/EW plant using the CESL high temperature high pressure chloride leach process.

Boleo Project Scoping Study

Mintec International

2001/2002

Scoping study for a copper leach SX/EW plant in Mexico's Baja California Sur.

Chambishi Cobalt Project

Chambishi Metals

2001

Refurbishment and modification of existing cobalt refining facility including neutralisation and iron removal circuit modifications, installation of new dewatering steps, and design of new zinc solvent extraction circuit.  Zambia.

Chambishi Metals Project

Anglovaal Mining

2001

EPC of a 40 MW DC arc smelter and associated works, Zambia.

Tail Gas Scrubbing Project,
Tasmania

Pasminco Hobart Smelters

2000

Design and construction management of tail gas scrubbing system incorporating saltwater to scrub SO2 from refinery offgases in packed towers.  Includes seawater pumping system.

MIM Albion Project

MIM Holdings Limited

2000

Study into the development of a demonstration plant utilising MIM Albion atmospheric leach process for low-grade copper bleed streams.

Lady Loretta Project

Noranda Pacific Pty Ltd

2000

Undertaking of bankable feasibility study into development of fly-in fly-out mine in northwest Queensland.  Scope involved all aspects of the Project including mining, processing, infrastructure, power supply, environment and government interaction.

Labuk Copper Project,
Malaysia

Leadstar Sdn Bhd

1999

Study and basic engineering of copper process plant incorporating oxidate chloride leaching, thickening, filtration and SX/EW and effluent treatment.

Potgietersrust Concentrator

Anglo American Platinum

1998

EPCM contract to increase production to 5Mtpa of platinum group metals ore

Mt Gordon Expansion Project

Aberfoyle / Western Metals Limited

1998

EPCM for $93m low-pressure autoclave leach, SX/EW plant to produce 44,000tpa of copper cathode.

Guelb Moghrein Copper/Gold Project

General Gold Resources

1997

Bankable feasibility study for the construction of facility to treat copper/gold refractory sulphide ore body.  Flowsheet comprised crushing, grinding, flotation, pressure oxidation, liquid/solid separation, copper SX/EW and cyanidation of residue.

Red Dome Gold Mine

Nuigini Mining

1997

Study into treatment options processing concentrates containing high arsenic.  Options considered included pressure oxidation, bacterial leaching, roast-acid-leach.  All were followed by copper SX/EW and cyanidation of the residue.

Yakabindie Nickel Project Stage 1

Dominion Mining Limited

1997

Detailed design of processing plant for nickel sulphide ores.  The flowsheet included pressure leaching, CCD, iron neutralisation, cobalt solvent extraction, nickel solvent extraction, cobalt precipitation, and nickel electrowinning.

Great Australia Copper Project,
Queensland

Cloncurry Mining NL

1996

Design and construction of 5,500 tpa copper, heap leach, SX/EW plant.  Scope encompassed heap design, all ponds and process plant.

Nickel/ Copper Refinery Upgrade

Impala Refineries

1996

Design and construction services for upgrading the Nickel Copper Refinery, including autoclave modifications and filtration equipment installation.

Hartley Platinum Project

BHP World Minerals

1996

EPCM for a 160,000tpm platinum/ nickel/copper concentrator, a smelter and base metal refinery and all surface infrastructure, in Zimbabwe.

Empress Nickel Refinery

Rio Tinto (Zimbabwe)

1996

EPCM contract for a nickel/copper matte processing plant including matte milling, atmospheric leach, copper EW, nickel EW and neutralisation.

Sanyati Copper Mine Company

Munyati Mining

1995

EPC contract for a 5,000tpa heap leach SX/EW copper plant in Zimbabwe.

Bateman Team
Project History and Experience
Pictures
Join our Email List
Home   |   Company   |   Boleo Property   |   Investors   |   News   |   Bateman   |   Contact   |   Legal Notice
© 2004 Baja Mining. Designed and Powered by Blender Media.